moca, 'london architect's first united states project'

Construction is progressing on the Cleveland Museum of Contemporary Art, which Clifford A. Pearson of the Architectural Record bills as architect Farshid Moussavi’s first United States project. The museum, located in University Circle, is scheduled to open this October.

Both the inside and outside will feature some very unique characteristics.

“Inside, they painted the perimeter walls and ceiling a deep blue, which will create 'the sense of an endless, boundary-less space' quite different from the white rooms found in most museums and galleries today," the article quotes the architect.

“The building shifts from a six-sided floor plate at street level to a rectangular plan on the top floor where the main gallery will enjoy daylight entering from above.”

On the exterior "the form changes with each side, so to fully comprehend it, you need to move all around it."

When completed it will be a far cry from the current incarnation of Cleveland’s MOCA.

“MOCA, which was founded in 1968 in a storefront, has rented a second-story space from the Cleveland Play House since 1990. Jill Snyder, MOCA's executive director, says the museum asked Moussavi for an iconic building that embraces cutting-edge technology, is environmentally friendly, and works with its context. The building, which has geo-thermal wells for heating and cooling, is expected to achieve at least a Silver LEED rating.”

Read the full story here.